(1) Raw materials entering the workshop for processing, including paddy, rice, etc. Confirm the variety and quantity of incoming materials.
(2) Request the latest (within 3 days) quality inspection report for the batch of materials.
(3) Send the incoming materials to the inspection institute for quality inspection when necessary, and fulfill the responsibility of raw material quality management
(4) Compare with the raw material requirements in the production plan to determine whether it is the required raw material. If there is any difference, the workshop manager should be notified to handle it according to regulations.
(5) Inform the loading personnel of the loading time and the location of the loading port.
Incoming material acceptance operating procedures for rice processing equipment
Jun 12, 2024
Leave a message
